001FIELD TEST
WINTER WALKWAY CLEARING
Recorded Snowbotix field footage of the SMUR platform plowing an accumulated walkway in live winter conditions.
- MODE
- Snow
- ATTACHMENT
- SNOWPLOW + DE-ICER
- SOURCE
- Snowbotix footage
- STATUS
- RECORDED
ENVIRONMENT
Campus-scale walkways and building approaches, active snowfall
CHALLENGE
Pedestrian routes have to stay open through a storm, not get cleared after it — and the people doing that work are outside in the worst of it.
CAPABILITY APPLIED
Snowplow attachment with de-icing, autonomous route following
OBSERVED IN FOOTAGE
- —Full blade of snow carried off the walkway in a single continuous pass
- —Cleared surface behind the machine down to hard pavement
- —Repeat passes on the same mapped route as accumulation continued
- Plow widths
- 4 ft, 5 ft or 6 ft
- Maximum snow depth
- Up to 24 inches (multiple passes)
- Clearing efficiency
- 1 acre/hour (typical)
- Coverage per charge
- Up to 5 acres
- De-icing
- Liquid calcium chloride (eco-safe) or solid application
001.1MORE TESTS
Other recorded work.
001.2NEXT STEP
Bring us a site.
Field demos run from the Ypsilanti Township headquarters and demo center, or on your ground. Bring the hardest route you have.
- info@snowbotix.com
- PHONE
- +1 (347) 927 0009
- HOURS
- Mon–Fri 8AM–8PM EST
- HQ
- 2701 Airport Dr, STG #3, Ypsilanti Township, MI 48198